Firefighting Water Storage Reservoir, Liverpool
Project:
A fully watertight, impermeable lining system for an existing ‘off-line’ water storage reservoir at the South End Mill site in Liverpool, measuring 16.4m x 25.1m tapering to 21.0m x 1.7m deep.
Client:
ADM Milling UK
Summary:
The project involved the supply and installation of our Landflex PVC120AP 1.2mm geomembrane above a protective layer of Landflex G3000 geotextile.
Challenges:
Prior to any lining works being undertaken our Butek Landline team identified a number of issues that needed to be addressed before the team could attend site and commence installation work.
The remedial works undertaken included:
* Removal of loose vegetation
* Removal of trapped air and water pockets under the existing membrane and removal of any damaged sections
* Making good the concrete structure or brickwork that would enable us to create a solid batten fix for our lining material.
The reservoir was an irregular shape with a stepped section to one end and sloped corners with a lower sump section.
Our Solution:
The material of choice on this occasion was our Landflex PVC120AP 1.20mm impermeable geomembrane offering great strength and highly flexible
properties. The membrane has a yield point of 300% in every direction and was the perfect choice for this project.
The material was pre-fabricated into large suitably sized bespoke panels in our Billericay factory prior to deployment, and then trimmed and welded to fit on site by our directly employed Butek Landline installation technicians. The geomembrane was installed over a layer of our Landflex G3000CBR protective geotextile and secured in place using grp battening with M8 x 55mm galvanised steel stud anchors.
Contract Period:
The project was successfully concluded within the specified time frame agreed of four days.