Fragmentation Landfill Capping: Cardiff

Client:
Cardiff Bay Development Corporation

Engineer:
Hyder Consulting

Location:
Cardiff, South Wales

Contract Size:
90000m² 1.5mm Landflex HCR Smooth, 30000m² 1.5mm Landflex HCR-DRS, 120000m² Landflex VR300 protective geotextile, 120000m² Landflex GS6-TF/MR300 Geocomposite. Construction and Vertical lining of 870LM x 5m deep perimeter Gas Cut Off Trench

Purpose:
Fragmentation Landfill Capping for Land reclamation

Contract Period:
28 Weeks

Read more about our Landfill Capping services HERE

You may also find interesting...

Encapsulated Polystyrene Infill, London

Project: Encapsulated Polystyrene Infill Project, Supply & install EPS wrapped blocks to three road bridge arches in London. Client: F M Conway Summary: The encapsulation of Expanded Polystyrene blocks with

Read More

EPS Infill to Railway Bridge, Cardiff

Project: EPS Infill Contract. Supply EPS wrapped blocks for lightweight fill to replacement bridge. Client: Kier International Summary: The supply and installation of impermeable membrane to encapsulate expanded polystyrene lightweight

Read More

Irrigation Lagoon, Lancashire

Client: Medlar Fruit Farms Limited Location: Preston, Lancashire Contract Type: Impermeable geomembrane linings utilising Landflex PE100LL membrane with protective Landflex G3000 geotextile underlayer. Contract Period: 4 Days Purpose: Supply and

Read More

Engine Arm Aquaduct Relining Project

Client: Canal & River Trust funded by Historic England (English Heritage) Employer: Kier Construction, Solihull Location: Smethwick Contract Type: Relining  project utilising Landflex EP100 composite membrane with protective Landflex G3000

Read More

Monmouthshire & Brecon Canal : Relining Project

Client: CPC Civils Employer: Canal & River Trust Location: Llangattock, Powys Contract Size: Supply and installation of 8,000m² 1.20mm Landflex PVC120AP Summary: Supply and installation of 8,000m2 PVC120AP 1.2mm geomembrane

Read More